SOUTH STREET AT SEA STREET
- DARYL AVERY SWANSON
- Feb 11
- 1 min read

Work is now completed on South Street at Sea Street. The last of the road work will occur in front of the job site to install drainage structures and the connections to the existing force mains, which will occur at the time of commissioning. On the job site, the gravity sewer main connecting the building to the sewer in the street will be completed this month, followed by the on-site draining systems and utility connections. In the building, pipe work is completed and ready for the electricians and plumbers to work on integrating the system processes.